ARTISTS FOR HUMANITY EPICENTER, SOUTH BOSTON, MA
Full M/E/P design for the non-profit education group Artist for Humanity’s new 22,500 SF headquarters and studio space. Contains painting, photo, silkscreen, and sculpture studios. Received a LEED certification at the highest Platinum level. Rooftop photovoltaic solar array produces 100% of electricity for the facility.
WESTMINSTER SCHOOL, SIMSBURY, CT
Provided full M/E/P FP services for this new construction of an 80,000 SF Science Center. The HVAC system is 100% geothermal with no boiler. Each room is equipped with occupancy sensors to control heat, light, and ventilation. Received a LEED Gold certification.
SERVICE CREDIT UNION, PORTSMOUTH, NH
New 100,000 sf signature headquarters, four story building, attempting LEED Gold certification. Complete MEP/FP system was designed. HVAC systems was a geothermal system with a Under floor Air Distribution system.
MODERN THEATRE, BOSTON, MA
Complete renovation of existing historical theater into a new theater and new 10 story 197 unit dormitory. Full M/E/P/FP was designed, mechanical system was Whalen units for dorms and Roof Top Units for theater and corridor. This project is LEED Gold certified.