artsforhumanityBoston.jpg

ARTISTS FOR HUMANITY EPICENTER, SOUTH BOSTON, MA

Full M/E/P design for the non-profit education group Artist for Humanity’s new 22,500 SF headquarters and studio space. Contains painting, photo, silkscreen, and sculpture studios. Received a LEED certification at the highest Platinum level. Rooftop photovoltaic solar array produces 100% of electricity for the facility. 

Zade provided full M/E/P FP services for the 82,000 SF three story private Jewish school building. Project included a 435 person auditorium and 6,500sf gym. Mechanical system was Energy Recovery, Roof Top Units, and Fancoil with VAV for every classroom. Rooftop photovoltaic solar array produces partial electricity for the facility. LEED certification in process.

WESTMINSTER SCHOOL, SIMSBURY, CT

Provided full M/E/P FP services for this new construction of an 80,000 SF Science Center. The HVAC system is 100% geothermal with no boiler. Each room is equipped with occupancy sensors to control heat, light, and ventilation. Received a LEED Gold certification.

PHOTOGRAPHY Anton Grassl/ESTO

SERVICE CREDIT UNION, PORTSMOUTH, NH

New 100,000 sf signature headquarters, four story building, attempting LEED Gold certification. Complete MEP/FP system was designed. HVAC systems was a geothermal system with a Under floor Air Distribution system. 

 

MODERN THEATRE.jpeg

MODERN THEATRE, BOSTON, MA

Complete renovation of existing historical theater into a new theater and new 10 story 197 unit dormitory. Full M/E/P/FP was designed, mechanical system was Whalen units for dorms and Roof Top Units for theater and corridor. This project is LEED Gold certified.